Shandong Yanggu Xinhui Cable Co., Ltd. the company always adhere to the quality first, customer supreme principle, the production of products of PVC insulated wire and cable, rubber insulated cables, power cables, control cables, electric welding cables, rubber sheathed flexible rubber sheathed cables for mining purposes, soft cable, XLPE power cables and various specifications of flame retardant and fire resistant cable that conforms to the national standards, quality assurance, to allow customers to buy a satisfactory, with ease, avoid menace from the rear.

0086-4000-667-889

TEL:

SERVE POWER OF CHINA

GUARANTEE THE SAFETY 

   

TEL
0086-4000-667-889

Mobile web site

    
Search

KEYWORDS:

Contact Us

HOTLINE:0086-4000-667-889
Sales Department I:
0086-635-6551777、6551788
Fax:0635-6550888
Sales Department II:
0086-635-6551198、6551616、6551189
Manager Li:0086-13376356768
Manager Sun:0086-15552165888

Production headquarter:
0086-635-6556788
Quality inspection headquarter:
0086-635-6550567
Financial headquarter:
0086-635-6554678
Zip code:252327
Website:http://www.sdygxh.com
Address:
Yanggu Xiangguang (Ecological) Industrial Park in Shandong

Copyright © 2020 Shandong Yanggu Xinhui Cable Co., Ltd 鲁ICP备17012960号 Powered by www.mitoyo.com.cn
HOTLINE:0086-4000-667-889

Operation and maintenance of wire and cable

[Abstract]:
(1)corrosionmonitoring.Thesurroundingsoilnearthelineshouldbemeasuredwithaspecialinstrument.Ifitbelongstotheanodearea,correspondingmeasuresshouldbetakentopreventelectrolyticcorrosionofwireandcablemetal
(1) corrosion monitoring. The surrounding soil near the line should be measured with a special instrument. If it belongs to the anode area, corresponding measures should be taken to prevent electrolytic corrosion of wire and cable metal bushing. The wetting soil around it or the soil covered by domestic refuse often occurs chemical corrosion and microbial corrosion. According to the voltage value in the anode area, proper cathodic protection measures or drainage devices are selected.
(2) insulation supervision. According to the importance of each cable and wire, a preventive test plan is made, and the weak links are found in time to eliminate the defects that may occur. In general, after the preventive test, the external protection layer is also required for the direct current voltage test, as well as the detection and elimination of the defects of the outer protective layer.
(3) load monitoring. Generally, the maximum current value is stipulated according to the sectional area and insulation type of conductor. The main load monitoring measures are measured by various instruments, such as load current or electric skin temperature, so as to prevent the insulation from exceeding the allowable maximum temperature and shorten the cable life.
(4) temperature monitoring. Measurement of temperature should be carried out in summer or at maximum load. When measuring the temperature of a directly buried wire and cable, the temperature of the soil with no other heat source in the same area should be measured.